Work Schedule
Decide on the design of your new kitchen (or bathroom, ensuite, laundry etc).
Selected the materials, colours and finishes
Place your order and pay the required deposit.
Your new kitchen is then manufactured to your specifications by experienced tradesmen.
As construction is nearing completion, we will contact you and arrange a suitable date for installation.
Old cabinetry will need to be removed. Stateline Cabinets can arrange this if required.
Qualified tradesmen will complete the installation. They will need clear access to the site.
A kitchen with laminated bench tops and doors will normally take 3 - 4 weeks from order confirmation to full installation. Granite bench tops or painted doors will take a little longer.
Whenever possible we arrange for granite tops to be installed within 2 days of the kitchen installation to minimise any inconvenience to you.
An Electrician or Plumber may be required during the removal and installation phases. If you want, Stateline Cabinets can arrange these services for you. |